• Albion-Middle-School-Interior-Classroom

Albion Middle School

The renovation of Canyons School District’s Albion Middle School was a uniquely challenging and exciting project. The challenge began with an intensive examination of both the physical structure of the 1984-built school and the functional deficiencies of the existing layout. Through extensive collaboration with faculty and district curriculum focus groups, FFKR created a program for the reconfiguration of the original pod open classroom arrangement.

This renovation transformed the school from its pod-era design with dark walls, no light, and congested circulation issues into a bright, organized school that functions like a brand new facility. The upgrades and reconfiguration resulted in a light-filled and active space that will inspire students and make them proud to be Albion Knights.